Heating enquiries for construction sites

Discuss the heating requirements of occupied work areas on your construction project.

Building under construction with an unfinished structure

Plan your installation

Construction sites vary widely in enclosure, exposure and available power. Tell us about the work area and operating conditions so our team can assess the application before proposing equipment.

Include the work area dimensions, available electrical supply, mounting options and exposure to dust or moisture.

Contact our technical team

Planning brief

An occupied work area on site

Within a 12 × 20 m construction floor, this brief marks a 6 × 8 m occupied work zone. Equipment selection starts with the site conditions, not just the floor area.

Whole space12 × 20 m240 m²
Selected zone6 × 8 m48 m²

Assumptions for this example. Send details of enclosure, dust, moisture, available power and mounting options. This brief does not specify equipment for drying building materials.

12 m 20 m
Selected zone; not a radiation footprint · 48 m²

Discuss this project

No model or quantity is specified before the operating conditions are reviewed.

Contact our technical team

Project consultation · Construction sites

Contact form

We use your contact details to respond to your message. Privacy information

Search the Elcon catalogue

Find a product series by model, lamp technology or specification.